Dredging project at Istanbul Airport, Turkey
| Location | Fuel Supply Port at Istanbul Airport |
|---|---|
| Client | Turkish Fuel Services (TFS) |
| Period | August - Noember 2025 |
| Equipment used |
Amazone
|
| Dredging volume | Approx. 800.000 m3 |
Scope of the work: Deepening of the IGA Fuel Port in Istanbul.
The IGA Fuel Port is where all the kerosene for the airport is delivered. As the airport grows, the port must also provide access to larger vessels.
The project involved dredging several areas in the port and the access channel, after which the dredged material was transported via a floating pipeline to a land depot. The material to be processed ranged from clay and stones to sand and silt.
The project was completed in November 2025.