Suriname River Dredging Project

Location Suriname river, Paramaribo
Client Ministry of Public Works of the Republic of Suriname
Period 2021-2023
Equipment used Delta Queen I
Kabalebo
Kees Jr.
Lesse
Mahury
Parana
Saramacca
Argus 1
Dredging volume Estimated volume : 420.000 m3

About the project

Contract execution: Suriname River Dredging Project 2025 (SRDP2025) by Joint Venture Baggerbedrijf De Boer B.V. – Boskalis B.V.

The Suriname River is the main access to the port of Paramaribo. Due to ongoing siltation from the Amazon Delta, the depth is decreasing, making continuous dredging necessary. The Joint Venture has been dredging in Suriname since 2021, and this is the third contract.

The first two contracts involved deepening the river: SRDP2021 brought the depth to -4.5 m, followed by SRDP2022, which deepened the channel to -5.75 m, including maintenance work for two years.

The current contract, SRDP2025, concerns maintenance dredging until October 2030. We are responsible for maintaining the depth of -5.75 m along the 68-km-long channel and anchorage. This guarantees safe and smooth access from the sea to the ports of Paramaribo.

More photos coming soon

Additional work Pumping Station near Kleine Waterstraat